Company Profile:
ANADOLU EFES BÄ°RACILIK ve MALT SAN A.S. Ankara Factory is producing 200.000.000 It Efes Pilsen Beer annualy.170 people is working in three shifts.
Cogeneration Plant:
Cogeneration power plant with 1 x 18V28/32H MAN B&W Holeby gen-set(3,8 MWe) is in operation at Anadolu Efes Bira ve Malt San.A.S. Ankara brewery factory since September 2001. A service agreement for 10 years is signed with the customer including service and spare parts which ensures a guaranteed system availability for 8000 hours per year.
Waste Heat recovery:
The waste heat in the exhaust gas and engine jacket water of the cogeneration unit is being recovered for supplying steam and hot water requirement of the factory proccess. The waste heat recovery steam boiler is installed with an additional burner application which can supply instant peak steam demands of the brewery factory up to 7 tons per hour at 8 BAR.